Lighthouse has a new layout. Prefer the old one? Return to the old layout, and switch back any time from the link at the top of each page.

process execution should accept two results

#65

If a process step returns two steps it should notify Restfulie whether to run them in parallel or sequential and when to join those threads.

Reported by Guilherme Silveira · May 21st, 2010 @ 09:05 AM

State: new
Milestone: none
Assigned to: nobody

Activity

  1. Guilherme Silveira
    Guilherme Silveira
    • Tag changed from client, mikyung, parallel, process to client, feature, mikyung, parallel, process

    May 21st, 2010 @ 09:05 AM

Please Sign in or create a free account to add a new ticket.

With your very own profile, you can contribute to projects, track your activity, watch tickets, receive and update tickets through your email and much more.